Salient Features

Salient Features of Project

Particulars Details/Status
Project Name 4-Four Laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km. 150.100 of NH 530B/Design Km. 123.100) in the State of Uttar Pradesh on HAM mode
NH No. (New/old) NH-530B
Mode of Execution Hybrid Annuity Mode (HAM)
Concessionaire Name M/s GR Devinagar Kasganj Highway Private Limited
Date of Letter of Award (LOA) 29.03.2023
Appointed Date Yet to be Declared
Construction Period (in Days) 730 Days from the Appointed Date
Schedule Completion Date 730 Days from the Appointed Date
Operation & Maintenance Period 15 years from COD
Independent Engineer M/s URS Scott Wilson India Pvt Ltd, In Joint Venture with Almondz Global Infra Consultant Ltd.
Authority Name National Highways Authority of India, PIU-Badaun
Independent Engineer Mobilization Date Yet not mobilized
No. of Lanes/ Configuration 4/6 Lane
Bid Project Cost 1226.87 Cr.
Total Length of the Project 57.967 km (CA) / 58.342 (Design)
No. of Elevated Viaducts 04 no.
No. of Underpasses VUP-10 no., LVUP-01 nos.
No. of Major Bridges 01 nos.
No. of Minor Bridges 23 nos.
No. of Culverts 82 – Box Culverts
30 –Pipe Culverts
Toll Plaza 01 nos.
Rest Area 02 nos.