| Particulars | Details/Status |
|---|---|
| Project Name | 4-Four Laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km. 150.100 of NH 530B/Design Km. 123.100) in the State of Uttar Pradesh on HAM mode |
| NH No. (New/old) | NH-530B |
| Mode of Execution | Hybrid Annuity Mode (HAM) |
| Concessionaire Name | M/s GR Devinagar Kasganj Highway Private Limited |
| Date of Letter of Award (LOA) | 29.03.2023 |
| Appointed Date | Yet to be Declared |
| Construction Period (in Days) | 730 Days from the Appointed Date |
| Schedule Completion Date | 730 Days from the Appointed Date |
| Operation & Maintenance Period | 15 years from COD |
| Independent Engineer | M/s URS Scott Wilson India Pvt Ltd, In Joint Venture with Almondz Global Infra Consultant Ltd. |
| Authority Name | National Highways Authority of India, PIU-Badaun |
| Independent Engineer Mobilization Date | Yet not mobilized |
| No. of Lanes/ Configuration | 4/6 Lane |
| Bid Project Cost | 1226.87 Cr. |
| Total Length of the Project | 57.967 km (CA) / 58.342 (Design) |
| No. of Elevated Viaducts | 04 no. |
| No. of Underpasses | VUP-10 no., LVUP-01 nos. |
| No. of Major Bridges | 01 nos. |
| No. of Minor Bridges | 23 nos. |
| No. of Culverts | 82 – Box Culverts 30 –Pipe Culverts |
| Toll Plaza | 01 nos. |
| Rest Area | 02 nos. |