4-Four Laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km. 150.100 of NH 530B/Design Km. 123.100) in the State of Uttar Pradesh on HAM mode

SPV Incorporated on: 02.05.2023
GRIL equity interest control in SPV: 100%
Total Length of the Project: 57.967 km (CA), 58.342 Km (Design)
Authority: National Highways Authority of India
Independent Engineer: M/s URS Scott Wilson India Pvt Ltd, In Joint Venture with Almondz Global Infra Consultant Ltd.
Bid Project Cost: 1226.87 Cr.
Date of LoA: 29.03.2023
Agreement signed on: 01.11.2023